US$ 129.00
Reduction ratio: 110:1
the following clearance angles must be observed for the third brake light: 10 degrees right and left
Elements (Gen I + II) und Track
1x Mounting plate
The steel holding structure is attached by pressing threaded rivets into the sill (note: the existing holes need to be drilled from 8
Kunststoffseil mit Schlaufe für Seilwinden 10mm & 8.000 kg length:15m x 10mm Reduction ratio: 110:1Synthetic rope with loop Finally a rope that completely eliminates the need for steel tailings. This eliminates the risk of steel parts being thrown around. Accessories: Of course we also have the right soft shackle for this synthetic rope in the program. This is not included in the scope of delivery.
US$ 129.00
US$ 99.95
US$ 35.99
US$ 79.99
US$ 59.99
US$ 69.95
US$ 79.99
US$ 29.95
US$ 39.99
US$ 49.90
US$ 14.99
US$ 69.95
US$ 22.99
US$ 27.99
US$ 34.95
US$ 59.99
US$ 39.95
US$ 99.95
US$ 69.95