US$ 212.50
NUMBER BUILT 512
At the top
Early SD70M body
Die-cast compensated chassis
One side of the caravan and both ends have windows
R40182 Mk3 First Open Rail Charter Services 11076 Coach A Scale_HO-Scale NUMBER BUILT 512In order to allow running at 125 mph on Britain's Victorian era railways, new rolling stock was needed by British Railways. Significant improvements over the Mk2 included new secondary air suspension between the bogies and the coach body as well as aerodynamic skirting on the underframe. Mk3 coaches are 75ft (23m) long enabling far greater capacity than older coaches. Mk3 coaches also incorporate disk breaks and wheel slip protection enabling faster
US$ 212.50
US$ 197.50
US$ 124.99
US$ 235.00
US$ 38.99
US$ 395.00