US$ 725.00
provision has been made to enable operation using the Pecolectrics SmartSwitch servo motor control system
Height 15 mm (without pins)
3 x Umbrellas
NUMBER SERIES E3101–E3200 later 86001–86048
The boilerhouse with its large chimney will just finish your industrial scene off nicely
4P-020-311 GWR Toplight Mainline City GWR Shirtbutton All Third 3907 Set 4 option-set-175 provision has been made toThe first order for these coaches was placed in 1915 but, due to the First World War, they were not built until 1920. The second batch was completed in 1921. Six sets of coaches were produced with each set comprising six coaches. The coaches were close coupled and constructed with a steel body rather than the traditional wooden panelling. Due to the restrictive loading gauge of the London Underground tunnels, the carriages are 7 inches lower than
US$ 725.00
US$ 120.00
US$ 750.00
US$ 725.00
US$ 425.00